This area contains information about planned and completed projects that will improve the distribution system.

Central, Main & Bare Hill Water Main

E-mail Print PDF

Originally this project started a few years ago as the replacement of the water main on Central Street from Main Street to Summer Street following a series of severe water main breaks.  After another series of breaks on Main Street the project was expanded to include replacement of a pipe on Main Street from Washington Street to Ipswich Road.  This is the last piece of original water main in the area which was installed in 1949.  Installation of a new main on Bare Hill Road, from Haverhill Road to Parsonage Lane, was also added to improve water quality on Parsonage Lane, Bare Hill Road, Comstock Lane and Brady Lane.  The pipe on Bare Hill Road provides a third avenue for water to get from our pump stations to the water storage tanks and downtown area.

Design work for the project began in December 2011 and we hope to obtain construction funding at the May 2012 Town Meeting.

Grove Street Project

E-mail Print PDF

In 2005/2006 new water mains were installed on Gail Street, Grove Street and portions of Washington Street and Colrain Road.  These areas had several major main breaks in the preceding years.  A 12" mains were installed on Grove Street, Washington Street from Main Street to just beyond Colrain Road, High Street Extension from Main Street to Washington Street and on Main Street from Washington Street to High Street Extension.

Ipswich Road Project

E-mail Print PDF

New water mains, hydrants and water services were installed along Ipswich Road, Pine Street and portions of Averill Street, Haverill Road, Mansion Drive, North Street and Woodside Road.  The project was funded by water revenues and was done as part of a Massachusetts Department of Transportation road and drainge project.  The water main work replaced over 7,000 feet of transite pipe that was installed in 1949 when the Town's water system was created.

Last Updated on Friday, 28 May 2010 11:18

Water Meter Replacement Project

E-mail Print PDF

Water meters are used to track how much water is withdrawn at our sources and how much is used by customers connected to the distribution system.  Every connection in Topsfield is metered - even those used by the Water Department.

During the winter of 2006, a three-year meter replacement project began in which all our customer's meters were to be replaced with new radio read meters.  Four hundred fifty thousand dollars ($450,000) was appropriated over the three year period to purchase and install the new meter reading system.  The work was conducted by Water Department employees and outside vendors.

Last Updated on Monday, 29 November 2010 07:48


Water Department Highway Department Parks and Cemeteries Department
279 Boston Street 279 Boston Street 8 Haverhill Road
Topsfield, MA 01983 Topsfield, MA 01983 Topsfield, MA 01983
(978) 887-1517 (p) (978) 887-1542 (p) (978) 887-1525 (p)
(978) 887-1543 (f) (978) 887-1543 (f)