Saturday, May 19th

Last update06:12:36 PM GMT

You are here: Home

Ipswich Road Reconstruction Project

The Ipswich Road Reconstruction Project has begun.  The project includes reconstruction of the roadway from Route 97 to Route 1 including new sidewalks, curbing, retaining walls and drainage.  New water mains will also be installed along Ipswich Road as well as a portion of Haverhill Road, all of Pine Street, parts of Mansion Drive and Woodside Road, and a section of North Street. Significant traffic delays are being encountered during the workday. Please seek an alternate route whenever possible.
  • General Information

    This category contains general information about the Ipswich Road Reconstruction Project.



Water Department Highway Department Parks and Cemeteries Department
279 Boston Street 279 Boston Street 8 Haverhill Road
Topsfield, MA 01983 Topsfield, MA 01983 Topsfield, MA 01983
(978) 887-1517 (p) (978) 887-1542 (p) (978) 887-1525 (p)
(978) 887-1543 (f) (978) 887-1543 (f)